I always use e-packet, and it usually takes eleven days. Almost clockwork.
Of course. It is brutal. Easy to forget and process an order without changing shipping method though.
I have tried most if not all of the "free" shipping methods and they average about 4-5 weeks.
I've found when it says that, it's on the boat (plane?).Tracking says "origin post is preparing shipment."
I've found when it says that, it's on the boat (plane?).
Usually shows up in US customs about 8 days later.
Could always cancel the one item, so the others will ship, then use the credit to reorder that item on a separate order. Just a thought.I placed an order today for 14 items because I wanted to use the MAP coupon code for an Sbody Macro DNA 75 before it expires. I was very careful to only order items labelled as In Stock, but I made a mistake about the status of one item. It says it will ship in 5 days. What do you think my odds are that my package will ship before 1/24 and they go on holiday?
Could always cancel the one item, so the others will ship, then use the credit to reorder that item on a separate order. Just a thought.
I have had stuff ship in LESS days than they say, and had stuff ship in MORE days than they say. What it is, is their supplier tells them they will get it to them by X date, if the supplier is on the ball, they get it sooner, if the supplier is not, they get it later than promised. Best bet is to always have "Ship's in X Days" in a separate order from everything else. JMHOI thought about doing that, but I'm afraid if I do, it will just delay things anyway. I'm not sure what the best option is. I've read on this thread people saying when FT says something will ship on a certain date, they usually don't ship on that date, but on a later date. I'm going to read through this thread and try to figure out how long the delay will likely be if they promise to ship in 5 days.
I have had stuff ship in LESS days than they say, and had stuff ship in MORE days than they say. What it is, is their supplier tells them they will get it to them by X date, if the supplier is on the ball, they get it sooner, if the supplier is not, they get it later than promised. Best bet is to always have "Ship's in X Days" in a separate order from everything else. JMHO
I ordered a VapeCige VTBox250 from Fasttech on 12/28 and it updated to "shipped" on 1/9. Tracking says "origin post is preparing shipment." I had totally forgotten about the Chinese New Year thing, so we shall see.