Copper Creek Chit Chat, Part #4

Status
Not open for further replies.

RickMc

Vaping Master
ECF Veteran
Verified Member
Feb 26, 2012
3,818
14,902
Fontana, CA
Bye the way...hi, all. The move is utter pandemonium. I still have 150,000 square feet of material on the floor....racks are going up in the new half of the building, but not nearly quickly enough. The racking installers are falling behind. We are trying to move 28 trailer loads a day, and they're not consistently building rack ahead of us fast enough.

All this while we have to keep our normal day to day operations running as normally as possible. :eek:
 

RickMc

Vaping Master
ECF Veteran
Verified Member
Feb 26, 2012
3,818
14,902
Fontana, CA
I can't like that at all Rick. And can't imagine the frustration level. ugh.

Well, amid all the frustration, I'm really proud of my team. They have seriously stepped up, and are doing a great job given all the issues we have had with contractors and suppliers and such. And as usually happens in tough times, I am seeing some of the quiet, under-the-radar types distinguish themselves as stellar performers. I'm making lists of people who are going "above and beyond" and am planning some reward/recognition for them. :)
 

FlyingV

ECF Guru
ECF Veteran
Verified Member
Dec 23, 2010
31,008
125,756
Verified Witchdoctor - In a Hut
11 till daylight saving 19 till spring. But much later in WI :lol:


Sent from my iPhone using Tapatalk
True. We have until May before we can consider putting away snow removal stuff. drats.

Fresh pasta and home made sauce tonight. Yum!
 

FlyingV

ECF Guru
ECF Veteran
Verified Member
Dec 23, 2010
31,008
125,756
Verified Witchdoctor - In a Hut
Just fill up the camper drinking water lines with your favorite adult beverage and you won't have to worry about frozen pipes. :)
I like the way you think! :lol: We'd be showering it it as well if we fill the fresh water tank. hmmmm....
 
Status
Not open for further replies.

Users who are viewing this thread