Long lead time on Sampler Pack, Delivery is actually good

Status
Not open for further replies.

saxguy9345

Senior Member
ECF Veteran
Jan 16, 2011
95
55
PA
Thanks to this VS subforum I finally figured out these 5ml sampler bottles lol they drip SO WELL and excess juice gets caught in the recessed part, no spillage. I love me some BWB juice but those cheap plastic bottles get so messy around the tip after 2-3 drips...

SO Now that I don't need to transfer my VS samples to another tiny bottle, I dripped some Rosewater this morning and all I can say is shut the front door is this good. I was skeptical because the bottle smelled a little like other dissappointing, perfumy liquids that were disgusting, but I think the best way to describe Rosewater is "It's as pleasing to your taste buds as is the smell of a rose to your nose". I can't remember which specific ecf member said it was almost therapudic, but I agree 100%. It made me wonder if the dream chemist aka Eric would take a stab at a Honeydew juice. I used to love going to the edge of my gram's yard and plucking a fresh honeydew flower to chew on, really aromatic and could "smell the taste" better than tasting it, kinda like this Rosewater.

Safe to say I'm dissappointed you can only order 5 juices at a time, it's going to be tough to narrow it down :D
 

Chornbro

Ultra Member
ECF Veteran
Verified Member
Mar 30, 2011
2,631
649
37
VA/DC/MD Area
Damn, just read this... put in an order for a sample pack on Friday... with you guys being on vacation, looks like its going to be a little while before I get my sampler.

BUT...

I don't need juice desperately, I have plenty... and if the juice I receive is as good as the VS stuff I tried at my buddy's house, its going to be WELL WORTH the wait!
 
Status
Not open for further replies.

Users who are viewing this thread