Snails - Response on Threads Part 8

AG51

ECF Guru
ECF Veteran
Jan 23, 2011
82,919
390,399
Dat Way →
Desserts :)

1ecd7b4ed2efa43f99bead379a692a96--frozen-strawberry-desserts-summer-desserts.jpg


smiley-girl-hubba-hubba_zpswlkxdcbj.gif
 

CES

optimistic cynic
ECF Veteran
Verified Member
Jan 25, 2010
22,181
61,133
Birmingham, Al
The addition is going as slowly as ever, but it is going. The HVAC, electrical and plumbing rough in have all passed inspection. The contractor has to add some roof brackets for the framing inspection and then the siding and shingles can be put on.
 

Flowersoul

Vaping Master
ECF Veteran
Verified Member
Mar 20, 2009
3,316
71,895
NE Florida
The addition is going as slowly as ever, but it is going. The HVAC, electrical and plumbing rough in have all passed inspection. The contractor has to add some roof brackets for the framing inspection and then the siding and shingles can be put on.
As they say......slow, but sure! It has to be somewhat frustrating, though!
 

Users who are viewing this thread