Hey Everyone,
Here's an update I felt needed a new thread instead of simply adding to the top stickied thread.
Ace/808 Adapters:
Complete - A few shipped this afternoon, rest shipping tomorrow. From here on out, our 901 adapters will also be 808 adapters.
Protege Mechanical Switches:
90% Done. Waiting on lazer cut contact disks and posts.
Protege USB Extensions:
90% Done. Assembly starting tomorrow. Waiting on lazer cut springs.
Prodigy V1 Mechanical Switches:
Will start taking a preorder for these within the next week or so. Should be done within 10-14 days after.
Prodigy V2:
Coming standard with Mechanical switch. Already in Production.
Here's an update I felt needed a new thread instead of simply adding to the top stickied thread.
Ace/808 Adapters:
Complete - A few shipped this afternoon, rest shipping tomorrow. From here on out, our 901 adapters will also be 808 adapters.
Protege Mechanical Switches:
90% Done. Waiting on lazer cut contact disks and posts.
Protege USB Extensions:
90% Done. Assembly starting tomorrow. Waiting on lazer cut springs.
Prodigy V1 Mechanical Switches:
Will start taking a preorder for these within the next week or so. Should be done within 10-14 days after.
Prodigy V2:
Coming standard with Mechanical switch. Already in Production.