03/12 #2
on the public works worksheet, in cell c32, insert a formula that will calculate the projected operations cost after the forecasted increase in cell b30 is added to the 2016 total (in b32). Ensure that the reference to cell b30 is an absolute cell reference, and then copy the formula into the range d32:f32.
i haven't taken a math class in a decade have mercy on me
Help if you want it. Skip if you don't!
Formula for c32 =$b$30+b32
Click once on cell c32, click and drag that box over to f32 to copy the formula into d32:f32
Don't know if I should be happy or sad that I can Excel in my sleep :/
EDIT:
GAH the typo in the picture! I are smrt, I promise!