So I am completely beat.
Was pouring a concrete slab at my folks place for their barn. 1 down 2 to go.....2 8 yard slabs, one 10 yard.
Working on an 8 yard slab mostly by yourself is hard enough, but the truck brought the wrong mix....it came with rock up to 2" when I ordered 1/2".....and it also came with an accelerator (makes it set up faster) which i DID NOT ask for...both made my job harder, and made doing a nice finish impossible. What I got was foundation footing mix to make a slab out of...which means someone just poured footings with a slab mix...3000 psi instead of 5000, which means the footings will look nice, but be cracked to all hell in a year or two.
Sent with one hand, the other is busy