Search results

  1. Tai Pan

    Genisis / Kronos Update

    Remain calm guys, I know that this needed a long time. Reasons for that have been posted by me. All material is with me and there are already Kronos shipped. But I am serious ill and suffering from a chemotherapy which slows down my assembling speed. But all boxes will come. Uwe
  2. Tai Pan

    Genisis / Kronos Update

    Hi all, the first boxes are out and we are in production. But for the final assembly and testing we need more than 30 minutes per box. Therfefore it will need a time until all are out. Here an image of the first running box: Murphy was not on holidays and visited us again. In our...
  3. Tai Pan

    Genisis / Kronos Update

    The SMD assembled boards are back and we are testing the first units. If all is ok we will start to deliver end of next week. But for the final assembly and testing we will need about 200 working hours which will take some time.
  4. Tai Pan

    Genisis / Kronos Update

    The maximum discharge rate of the batteries is 4 A. For the Kronos we use a holder with a protection circiut. The circuit limits the maximum current to 3A.
  5. Tai Pan

    Genisis / Kronos Update

    That is correct. For the board project we used for Cinch atomizer a pitch of 0,5 and changed for the 510 ones to 0,75. That means that the total new constructed bottoms parts from Electra Pipes fit the board 510 but not the Cinch atomizer. For the Kronos we use a holder for the connector which...
  6. Tai Pan

    Genisis / Kronos Update

    We are waiting for the PCB's. As you can read in the post above we had a meeting with Murphy. I can't tell you how I hate that guy. He is coming to our projects since a long time.:) But now Murphy is on holidays and he shall take his time. We don't need another visit. The status is now...
  7. Tai Pan

    Genisis / Kronos Update

    Read post 787! We are waiting to get the SMD assembled PCB's back. Than we start the final assembly. To give a time line is not possible because that depends on the free time the active members have for the assembly and there are a lot to do. A lot changed in the vaping world in the meantime...
  8. Tai Pan

    Genisis / Kronos Update

    The PCB's are out now for SMD assembly. When they are back we start the final assembly and I will make three crosses when I get rid of this project. :) It is running for a longer time, mainly caused by the pressure mould of the box. But we have all material now.
  9. Tai Pan

    Need help! my kanthal gives too much resistance

    Kanthal D from Sweden has the following resistance per meter: 0,15 mm = 70,7 Ohm ± 5% 0,16 mm = 67,15 Ohm ± 5% 0,20 mm = 42,97 Ohm ± 5% Chinese material sold by Heaven Gift is similar. Uwe
  10. Tai Pan

    Genisis / Kronos Update

    For Europeans we send automatically a charger with Schuko connector. But we don't know for all countries world wide which connector they need. If you are outside the US and outside Europe please send a mail what you need. We have: - charger with American connector - charger with European Schuko...
  11. Tai Pan

    Genisis / Kronos Update

    Hi Guys, here some news from me. I have all material for the box Kronos in hand now. The last boxes arrived in January. The other material was with me since beginning 2012. The boxes had been the problem and caused the delay. There are two images attached. The left and right boxes with an...
  12. Tai Pan

    Genisis / Kronos Update

    Hi all, the translation above shows what I mean. It was a long way but we took all time we needed bacause a mould is not cheap. But now it is ready and we can go on. Uwe
  13. Tai Pan

    Genisis / Kronos Update

    @Jed, exact your comment prevent people from doing new projects in the future. @wfarrar33, read post 724.
  14. Tai Pan

    Genisis / Kronos Update

    @Jed, if you are in a rush you should buy in a shop from stock and not participate in a project. A project is totally different from a shop. At the beginning there is an idea. Than we start to design and to build. In that process a lot of things can go wrong or cause delays. The first milled...
  15. Tai Pan

    Genisis / Kronos Update

    People stay cam. The problem is not the team but the pressure mould. The first injections are on the way to me for testing. This mould was a complicated and expensive thing. All other items are bought and waiting for assembly. We just need the box. :)
  16. Tai Pan

    Genisis / Kronos Update

    They need the airflow through the inner pole for the automatic and use 810 because that is quite more stable. 510 is only a so called standard because the eGo.The adapter is 4 mm high and has the boring on the side for airflow of the 510.
  17. Tai Pan

    Genisis / Kronos Update

    As a project we have done more than 1.000 Genisis. This type has been developped by Raidy and Ichbines. Both members of the German forum ERF. Mid of our project Raidy gave a license to a British company, Electra Pipes, to come on higher volumes. As far as I know there are now, including our...
  18. Tai Pan

    Genisis / Kronos Update

    This is a prototype and the CNC model for the pressure mould! This is just to show you that we are working on it. :) We are still in the mould making process. That is not done in a month. We had to make new construction drawings and some samples until all was fine. A mould costs several...
  19. Tai Pan

    Genisis / Kronos Update

    I have shipped all Genisis a time ago. If somebody hasn't got his delivery he shall send me a mail. Than I am able to check what happened. All had been sent by registered air mail. Therefore I can chase every delivery from here. To mention it here is useless. :)
  20. Tai Pan

    Genisis / Kronos Update

    A project is not an easy task. At first there is mainly an idea. Than this idea has to go into a product. You estimate a time and suddenly all goes wrong. Turner needs longer, quality is bad, quality of the second delivery is more worse, change the turner, a member has not time due to heavy...