jblack741 Senior Member ECF Veteran Mar 11, 2014 257 162 Detroit May 9, 2015 #1 May 9, 2015 Add bookmark #1 Initial markup/parts layout. Drilled, sanded and primed. Initial painting. Carbon fiber hydrodip and clear-coating applied. Final part fitment with wiring assembly Had a great time build this and have already started on the wiring for a raptor 120w version. Reactions: RaptorD.Meezus and JohnnyDill ••• More options Report Add bookmark Share
Initial markup/parts layout. Drilled, sanded and primed. Initial painting. Carbon fiber hydrodip and clear-coating applied. Final part fitment with wiring assembly Had a great time build this and have already started on the wiring for a raptor 120w version.
Davantrac Ultra Member ECF Veteran Verified Member Jun 3, 2014 1,190 1,272 Darlington, UK. May 9, 2015 #2 May 9, 2015 Add bookmark #2 The hydro and lacquer look fantastic. Well impressed. Reactions: jblack741 ••• More options Report Add bookmark Share
rhelton Vaping Master ECF Veteran Verified Member Aug 15, 2014 4,161 15,514 spokane, wa May 15, 2015 #3 May 15, 2015 Add bookmark #3 Me too Reactions: jblack741 ••• More options Report Add bookmark Share