I ordered it last night, along with batteries and a drip tip. It said a two week wait. Tonight I get a notice that my order has shipped.
I have Boge 2.0 cartomizers, both standard and low resistance. Are the low resistance cartos going to run too hot...I'm really sorry if that's a dumb question...
I have Boge 2.0 cartomizers, both standard and low resistance. Are the low resistance cartos going to run too hot...I'm really sorry if that's a dumb question...