So this is were I am at: a little behind
Some of you have asked for updates. All the brass reservoirs are ready, 510 connections pressed in. Door stock milled and most of it is cut to size. springs drilled and cut. wires are cut, striped and ready for solder. tubing caps cut to size.
I will be a couple weeks behind when all is said in done. most of you are aware I was alone for the past 4 or 5 weeks. I have been putting in long days to catch up. one of the reasons I haven't been on the forum as much.
All the mods in the pics - 3 of them will be available to the public.




Some of you have asked for updates. All the brass reservoirs are ready, 510 connections pressed in. Door stock milled and most of it is cut to size. springs drilled and cut. wires are cut, striped and ready for solder. tubing caps cut to size.
I will be a couple weeks behind when all is said in done. most of you are aware I was alone for the past 4 or 5 weeks. I have been putting in long days to catch up. one of the reasons I haven't been on the forum as much.
All the mods in the pics - 3 of them will be available to the public.



Last edited by a moderator: