i read around here that a 100% charged battery is at 4.2 volts. i dont have a multi meter and i want to know what percentage is 3.2 volts which is what they recommend to charge that battery at when using mechs. i only have an evic that tells me what percentage battery i got left. so if i need to recharge at 3.2 volts what percentage is that?