Hell raisers are doing good

I cut all the sleeve designs out today, they go to anodizing monday or tuesday, should have them back by thursday, will engrave tubes friday, assemble sat and sunday and ship monday
Also some of the illuminati tubes has very small scratches on tubes. I found the culprit. So here goes how these things are made to explain how they got by me.
First I make all the parts and then examine them to make sure they dont have dings and such. I then took them to anodizing, I get them back and just check that the color came out good by grabbing a few sample parts, then I engrave them with special handling care and roll them up in paper after done, I then bring them home and assemble them and pack them at the same time, then I print shipping labels and slap them on the boxes and go to PO.
The scratches on some of the tubes werent from me, they wouldnt have got past me, I look at everyone of them after machined. The anodizer hooks something up to them to do their process and put plugs in the threaded area. The metal they place them on and the way they are handled at anodizing was the reason for the small scratch on some of them. Took me a minute to figure it out, but I inspected the clear anodized standards and saw the same thing. Had a discussion with my anodizer about it. It has been handled. Sorry, I didnt even inspect the tubes after anodizing, I didnt think they would be rough with my tubes, I handled it though
So...... Hell Raisers are coming along on schedule, if anything knocks it off schedule I will keep yall updated. I wont miss a projected release date by much if I ever do, on that note flower LE's should be in peoples hands before christmas