◙ Li’l PINCH (←thang) ◙ pdib (←maker) ◙ not sayin’ (←just sayin’) ◙ shuh-ZAM! (←hyperbole)

Status
Not open for further replies.

Doffy

Vaping Master
ECF Veteran
Verified Member
Mar 15, 2014
8,220
40,975
Australia
Very nice! Don't bother to save any of the vegemite for me.
Just on that...

Toast... Ample butter... Tiniest amount of vegemite you can manage... Optional shaved parmesan to soften it :thumbs:

Sent from my LG-H815 using Tapatalk
 

TamiPac

Vaping Master
ECF Veteran
Verified Member
Jun 10, 2014
8,184
41,263
SE Texas
Oh, I am definitely going to try the vegemite. Never tried it before. Gotta do it.

btw, Doff, this is just perfect, because I love to try new flavors. :>)
If one of my kids tried to steal my Cadbury anything they would be pulling back bloody nubs. Just sayin'. :lol:
 

Doffy

Vaping Master
ECF Veteran
Verified Member
Mar 15, 2014
8,220
40,975
Australia
Oh, I am definitely going to try the vegemite. Never tried it before. Gotta do it.

btw, Doff, this is just perfect, because I love to try new flavors. :>)

1374107_587585661295571_176734790_n_zpsdaccd2af.jpg


BTW, eucalyptus concentrate vapes a bit like menthol, also a love/hate thing
 

pdib

ECF Guru
ECF Veteran
Nov 23, 2012
17,151
127,511
www.e-cigarette-forum.com
Oh, lest I forget, I did want to mention that I spent yesterday doing remodel prep*, but got back in the game today and finished up the machining on the caps, got them sealed up, checked for fit w/ the bodies. And it looks like tomorrow I'll be getting into some shaping.



* one element of our "scope of work" is that the shop desperately needs a new roof. It is leaking in multiple places. The good news on that is that I'm getting a metal roof (corrugated steel panels), and TWO skylights put in! I'na be sooooo in-touch with nature! :lol:
. . . with the sound of the rain, and, like, the light from the sky, I mean. :|
Yesterday, one of my tasks, tho, was to pull most of the insulation from the sheathing/rafters. :rolleyes:
 

TamiPac

Vaping Master
ECF Veteran
Verified Member
Jun 10, 2014
8,184
41,263
SE Texas
Oh, lest I forget, I did want to mention that I spent yesterday doing remodel prep*, but got back in the game today and finished up the machining on the caps, got them sealed up, checked for fit w/ the bodies. And it looks like tomorrow I'll be getting into some shaping.



* one element of our "scope of work" is that the shop desperately needs a new roof. It is leaking in multiple places. The good news on that is that I'm getting a metal roof (corrugated steel panels), and TWO skylights put in! I'na be sooooo in-touch with nature! :lol:
Yesterday, one of my tasks, tho, was to pull most of the insulation from the sheathing/rafters. :rolleyes:
Ew, I hope it wasn't fiberglass!
 
Status
Not open for further replies.

Users who are viewing this thread