PER FABRICATION SCHEDULE:
So, I feel the need to say something; although I really don't know exactly what to say .. . .
And there's really not any big deal thing going on; but things/schedule/production will probably get bumped/delayed a little bit; a half-day here, a day there . . .. I'm realizing it might add up and be . .. . well . .. . worth mentioning.
We need to get some work done on our 112 yr old house. Probably should have had it done 3 yrs ago; but, well, I been busy.

So, we had made some loose arrangements with a contractor; including that the scope of our work is peanuts to any reputable/busy contractor around these parts, and that we would be "fit in" over the course of the summer, when there was a lull between "real"/big jobs.
And so, "the course of the summer" turns out to be pro'ly sometime this month (and maybe some in June too). The time came sooner rather than later.
I had hoped to be pretty much wrapping things up with our list here, before having to deal with that other.
So, like I said, no big deal; but I will sometimes need to jump onto that horse and do some hoops. Trying to keep costs to a minimum, we are doing whatever research/spec.ing/sourcing of materials that require fab./delivery time, and we are doing whatever prep work and demo that's reasonable for us to do. Some meetings, some head scratching, some problem solving . . ..
I had some of that type of stuff over the weekend (some demo), and am looking to do some more mid-week.
I'm sure these things will add up over the next couple of weeks (or month, or couple months

) and result in some delay on our beloved (already geological) mod fab. schedule.
"Life", hey?
Apologies