I have seen it written here somewhere. I cannot find it now. When setting up the rm2 what size or in do you put under the atomizer. I am trying to make my air hole point 180° away from the button. I am not sure if the extra oring in its own bag was supposed to go under the atomizer but it doesn't seem to make a difference. I am sure that was for the seal around the 510 to prevent leaks. So it is doing its job. Anybody know where this was posted? Thanks fellow reonauts
Sent from my SM-N900T using Tapatalk
Sent from my SM-N900T using Tapatalk