Yes - for the next 3 weeks we will be rebuilding the site. There are four upgrades we want to get done and at least two of them will be done in the next 3 weeks:
-- change the server architecture and add another webserver
-- upgrade vBulletin from 4.0.6 to 4.1.2, which despite its non-major series numbering is in fact a major upgrade as the template engine is changing to what looks a better system
-- add a CMS front end to the site
-- have a new ECF forum template developed (maybe like our old Kirsch one, maybe not)
Currently the site runs on 2 servers, a DB backend and an Nginx web-facing box. Nginx is a superb server app but very hard to support, you need a top-level Nginx server admin for a site with traffic like this, and they are very thin on the ground. So we are going back to Apache as it is far easier to support, but this means we will need to add one or more new web-facing servers.
The CMS has been waiting on the server set-up change, so it will very soon be possible. The template has been waiting on the vB 4.0 series template engine becoming stable, if we'd already done it then it would have had to be re-done for v4.1.2.
So there are some major changes about to be implemented. No doubt there will be some glitches, but that is unavoidable. At least when it's done the site will be set up for the next couple of years. Every now and then you come to a 'break point' where some drastic changes are needed. The last one was a year ago, and when we are past this one we should be OK for 2 years.