I just got back from the CNC shop I contracted with to help build the Super Sixes. After examining all the prototypes of my units(bodies, adapters, switches), I can confidently say they meet and even exceed my quality standards (which is no easy task, given my attention to detail).
I was informed that all units will be completed within two weeks time frame, possbily even sooner.
All outstanding 3rd batch orders will ship first followed by the 4th batch orders. I also ordered extra units to have on hand.
These new CNC units even incorporate a few special tweaks to the original design.
I want to thank eveyone for being so patient with me and i am confident you will be most impressed.
David
I was informed that all units will be completed within two weeks time frame, possbily even sooner.
All outstanding 3rd batch orders will ship first followed by the 4th batch orders. I also ordered extra units to have on hand.
These new CNC units even incorporate a few special tweaks to the original design.
I want to thank eveyone for being so patient with me and i am confident you will be most impressed.
David