who's show??
got a link?
Indeed I would like to see that as well. I never remember to watch his show, guess I really missed out tonight!
who's show??
got a link?
Face, if I order a Standard on 12-17 (or when they return) is that shipping with new or old switch ?? Or can I purchase a current switch on its own ?? You must have a few lying around right ??Just want to keep my options open so I don't have to sell the HR if its not working out for me.
Hopefully its fantastic as you say ..... but then I'll want one for my spider![]()
They still show in stock....But when I got to checkout....it shows none available.
two things. First, and Ive read this, but the larger magnet will not fit without my pushing it down (when it may stick) and also it seems with magnets in the upper portion, that the throw is now longer.
do you find that to be true?
Truthfully I've broken a few magnets in mechanical devices and have never had a spring wear out. I believe Faceless is using a piano wire spring which is going to take a very long time to lose tension. Under perfect circumstances magnets will last forever and the best springs will eventually wear out but I think it's going to be a very long time before we need to replace any springs. Possibly years.
The new render looks Great!! I think that switch looks Awesome!!![]()
allmightgods show. Its over now but its on vapetvwho's show??
got a link?
Update: Really bad news, grint your teeth!! So the z axis motor on my machine I use to engrave broke (the part that makes it go up and down) Called Haas and they wanted 2 grand to replace motor and it would be 3 weeks, called around and found another place that will do the same thing for $800 and it would take 2 weeks, I asked for a rush and it doubled cost due to holiday coming up and it will be 3 business days, I paid the extra rush fees, they will be out to replace the motor tuesday, I have 140 tubes to engrave (70 small and 70 large battery tubes) that takes about 6 minutes per tube which is about 14 hours which is about 2 days work, then I have to assemble them, which is what I should have been doing tomorrow but now wont be until next thursday or friday which is when they will ship, so its about a 3-4 day delay, the flowers arent being engraved on my machine, they are being laser engraved and sending off monday to laser guy, so they will probably ship before or with hell raisers, in the meantime I cranked out 100 tubes and 100 blank sleeves for the next 2 LE's, so they will move very very fast, if my machines can keep up. Sorry for the delay, it is out of my control, with that being said, I cant do the cutouts for the "i" on the sleeve for the standards either, so they will be delayed also, my site will reflect this with a new date
Well my wife will appreciate her Flower sooner...I might take her switch though... lol
Bummer Fac! Too bad you can't feed your machines OJ.
You are a breath of fresh air. Some modders will think nothing of taking an extra 3-4 months. You are saying "really bad news" when, for circumstances totally beyond your control, you are missing a deadline by 3-4 days. We'll be fine, dude. Do what you have to do.
Nilbog face is making ss tanks. He thinks the zens might be just a little to long and might cause shorts. I think he said this week
I think I'm suppose to do a show this saturday, I dont remember where though, hopefully they contact me to remind me, I'll keep yall updated![]()
lol forgot the link
Genesis Atomizer Coil Building - E-Cigarette Review's, Tips
I'm also changing the ground screw to a phillips head, the allen wrench company cant keep up, so it will come with the phillips head screw on positive post (allen wrench tight draw knurled screw) for tight draw in bag, and phillips head ground screw. So you only need a phillips head screwdriver to change coil, you wont need an allen wrench as the tight draw screw is knurled and can be tightened and loosened with your fingers, So it will be version 2.2, in a few weeks maybe 2.3 and week after that 2.4 lol