OK, I have been quiet because my Zens are working great.......but, just wondering, anybody heard a timeline for the Febbies new fired quartz tanks and the new switches? I am fighting every day with my switches and I have packing tape on one of my tanks........Don't tell me how to DIY my switches to make them fire without fail, or make a poly tube out of a 20cc syringe because I don't take anything apart or DIY stuff (except juice). The only thing I'm doing is almost daily tightening up the screw.......So, is relief in sight for the mechanically challenged?
PS.......maybe the plan is to send everything when the ZAP is ready? If so, I can wait until then........
I thought that it was going to be after the pv lists were done...finished...caput...

