Good morning everyone. I've been out of work for four days now flat on my back sick with the flu which has set the time clock back 4 days on everything (that I had planned to do at any rate). I'm in today trying to catch up. Kevin has kept all the Simplicities and odds and ends shipping and he even started back stocking a few Simplicities. He's been doing a good job on those and I think it's time I bring him over and help me with the ELA's. So going forward, he'll also be doing the final prep and assembly on the ELA's along with me which should double our output since i'm the bottleneck these days.


