Indestructible
How are you liking the Cam-M? it's a beast.. kind of regretting letting it go.I'm running a .5 build in my Mephesto & Cam-M as we speak, I've been enjoying it for a couple of days now.
How are you liking the Cam-M? it's a beast.. kind of regretting letting it go.
.4 24 gauge dual coil @ 32 watts.
I'm going to try to fast track this one. This has been the first one of these that just grabbed me. I have test fit all the components and they fit perfectly. The one in the pics will be shipped to Harry tomorrow for blueprinting I'm hoping to have them in production not long after that.Awesome looking LBC tom...sign me up
Sent from my SM-N900T using Tapatalk
Sooo... that's, like, 3.6V - the bottom end of performance with a mech (ie, when it's time to swap the battery). Are you finding you dig the lower power with regulated? Just curious.
Gold stumpy or NarDa? Manta with copper afc? I just got a few Mantas in btw.Pictures are messed up. Hate that I'm not good at this ....
Pictures are messed up. Hate that I'm not good at this ....
Sooooo, no raw, handmade LBCs now? For those of us that opted out of the main run and jumped on the handmade run, do we get our spot in the main run back?I'm going to try to fast track this one. This has been the first one of these that just grabbed me. I have test fit all the components and they fit perfectly. The one in the pics will be shipped to Harry tomorrow for blueprinting I'm hoping to have them in production not long after that.
There will be plenty to go around. I don't care for modders that try to create false hype and false demand by limiting production. Almost all of these overhyped under supplied products are made on big machines... If there is a great demand run the machines a little longer. Once the first 50 (half of the first batch are sold I will put in for another batch of 100-200 depending on how it does. Doing these by hand with the equipment I have just isn't feasible unless I sold them for $500-600. These take me a solid 2 days each start to finish plus cost me 150-200 in supplies and tool wear/carbide destruction. If you absolutely insist I will make you one but imo it's just not worth it, but at the same time I saw someone pay $2500 for a Pandora over the weekend so there is that. The Pandora is an awesome mod but $2500? I will openly admit that if the Pandora maker would make a dna200 bottom fed Pandora I would happily pay that $2500...Sooooo, no raw, handmade LBCs now? For those of us that opted out of the main run and jumped on the handmade run, do we get our spot in the main run back?
Just to be clear, I'm not dropping out, no matter what.................
There will be plenty to go around. I don't care for modders that try to create false hype and false demand by limiting production. Almost all of these overhyped under supplied products are made on big machines... If there is a great demand run the machines a little longer. Once the first 50 (half of the first batch are sold I will put in for another batch of 100-200 depending on how it does. Doing these by hand with the equipment I have just isn't feasible unless I sold them for $500-600. These take me a solid 2 days each start to finish plus cost me 150-200 in supplies and tool wear/carbide destruction. If you absolutely insist I will make you one but imo it's just not worth it, but at the same time I saw someone pay $2500 for a Pandora over the weekend so there is that. The Pandora is an awesome mod but $2500? I will openly admit that if the Pandora maker would make a dna200 bottom fed Pandora I would happily pay that $2500...
Gold stumpy or NarDa? Manta with copper afc? I just got a few Mantas in btw.
Not yet.. I have your pair earmarked however.Mantas FTW!!!!! Have ya had time to get them converted yet?
Not yet.. I have your pair earmarked however.
There will be plenty to go around. I don't care for modders that try to create false hype and false demand by limiting production. Almost all of these overhyped under supplied products are made on big machines... If there is a great demand run the machines a little longer. Once the first 50 (half of the first batch are sold I will put in for another batch of 100-200 depending on how it does. Doing these by hand with the equipment I have just isn't feasible unless I sold them for $500-600. These take me a solid 2 days each start to finish plus cost me 150-200 in supplies and tool wear/carbide destruction. If you absolutely insist I will make you one but imo it's just not worth it, but at the same time I saw someone pay $2500 for a Pandora over the weekend so there is that. The Pandora is an awesome mod but $2500? I will openly admit that if the Pandora maker would make a dna200 bottom fed Pandora I would happily pay that $2500...