Catfish atty mods.

Status
Not open for further replies.

Chowderhead1972

Unregistered Supplier
ECF Veteran
Feb 19, 2013
9,112
31,913
Clarksburg, Maryland, United States
Pretty small genitals. ..

Very observant..... Now get out of my bathroom. It's mine and I will clean it as fast and frequently as I want.
Happy?
image.jpg
 
Last edited:

inswva

Do you even squonk, bro?
ECF Veteran
Verified Member
Jul 19, 2014
4,728
18,512
********Derringer Update*******
The Derringer is to be released in about 2 weeks. I had hoped for sooner.

I do have Lacias, Marquis, N22s, and Rogues coming in today.
The Phillipino order is on the same truck evidently.

Guess I'll just have to make do with my first Derringer until then. Thanks for the update, Tom.

This actually may work out better for me since I can now spend the money I was earmarking for the Derringer on something else and will have two weeks to replenish those funds! vape math!
 

pwheeler

Just Vaping
ECF Veteran
Verified Member
Nov 14, 2013
9,157
31,761
68
Weimar, TX
********Derringer Update*******
The Derringer is to be released in about 2 weeks. I had hoped for sooner.

I do have Lacias, Marquis, N22s, and Rogues coming in today.
The Phillipino order is on the same truck evidently.
That will work. Give me a little time to restock. My one Derringer is cranking out vapor day after day with no break. Love this thing!

Sent by REO vapor
 

Chowderhead1972

Unregistered Supplier
ECF Veteran
Feb 19, 2013
9,112
31,913
Clarksburg, Maryland, United States
Turk: could you continue the list but starting at #81 there will be a delay until the next run of pins are complete. I need to do something other than pins for a while, also the reason send ins have been done the second they arrived. As it stands I will have 150 pins to prepare. 120 pins are complete, the remaining 30 will be done long before the first derringer arrives. I have the materials coming today to do another 100 derringers but currently I lack the will. Every pin requires 15 steps 4 of which must be within .2mm times 150 pins. That's alot of steps it takes me about 30 minutes start to finish to make a pin once I have the measurements..

The delay for #81+ could be as much as 2 weeks but should be the weekend after the first 80 ship. Just want to be clear so there are no disgruntled customer. My goal is to keep you properly gruntled.
 
Last edited:

finagle69

Ultra Member
ECF Veteran
Verified Member
Feb 11, 2013
1,027
1,311
47
Sacramento, CA
Turk: could you continue the list but starting at #81 there will be a delay until the next run of pins are complete. I need to do something other than pins for a while, also the reason send ins have been done the second they arrived. As it stands I will have 150 pins to prepare. 120 pins are complete, the remaining 30 will be done long before the first derringer arrives. I have the materials coming today to do another 100 derringers but currently I lack the will. Every pin requires 15 steps 4 of which must be within .2mm times 150 pins. That's alot of steps it takes me about 30 minutes start to finish to make a pin once I have the measurements..

The delay for #81+ could be as much as 2 weeks but should be the weekend after the first 80 ship. Just want to be clear so there are no disgruntled customer. My goal is to keep you properly gruntled.

I am moderately gruntled. Thank you for your efforts.
 

rudedog

Ultra Member
ECF Veteran
Verified Member
Apr 4, 2014
1,711
5,302
toledo ohio
since you've been bfing atty for a while now I think most of us have a plenty of diff attys to keep us in clouds til the derringers get here and or the Pda.thanks Tom!



Turk: could you continue the list but starting at #81 there will be a delay until the next run of pins are complete. I need to do something other than pins for a while, also the reason send ins have been done the second they arrived. As it stands I will have 150 pins to prepare. 120 pins are complete, the remaining 30 will be done long before the first derringer arrives. I have the materials coming today to do another 100 derringers but currently I lack the will. Every pin requires 15 steps 4 of which must be within .2mm times 150 pins. That's alot of steps it takes me about 30 minutes start to finish to make a pin once I have the measurements..

The delay for #81+ could be as much as 2 weeks but should be the weekend after the first 80 ship. Just want to be clear so there are no disgruntled customer. My goal is to keep you properly gruntled.
 
T

TüBeGüY

Guest
Every one of my vapage bottles have been tossed aside. They didn't start out leaking, but after running 45-50 ml thru mine, each has started leaking and randomly losing pressure no matter how perfectly the home was drilled.
Wow that's a real bummer to hear....
I JUST ordered 20 of them ( I think I have 7 REO's now)
I was really hoping they were the bees knees.
Oh well.
 

rudedog

Ultra Member
ECF Veteran
Verified Member
Apr 4, 2014
1,711
5,302
toledo ohio
TüBeGüY;15242765 said:
Wow that's a real bummer to hear....
I JUST ordered 20 of them ( I think I have 7 REO's now)
I was really hoping they were the bees knees.
Oh well.

thier are fixes for them so dont throw them out right away.look back a few pages and youll see the fixes that were posted.ive never used them so idk how good they are at this point.
 
Status
Not open for further replies.

Users who are viewing this thread