Pretty small genitals. ..
What do you think of the logo?
View attachment 411889
********Derringer Update*******
The Derringer is to be released in about 2 weeks. I had hoped for sooner.
I do have Lacias, Marquis, N22s, and Rogues coming in today.
The Phillipino order is on the same truck evidently.
That will work. Give me a little time to restock. My one Derringer is cranking out vapor day after day with no break. Love this thing!********Derringer Update*******
The Derringer is to be released in about 2 weeks. I had hoped for sooner.
I do have Lacias, Marquis, N22s, and Rogues coming in today.
The Phillipino order is on the same truck evidently.
Turk: could you continue the list but starting at #81 there will be a delay until the next run of pins are complete. I need to do something other than pins for a while, also the reason send ins have been done the second they arrived. As it stands I will have 150 pins to prepare. 120 pins are complete, the remaining 30 will be done long before the first derringer arrives. I have the materials coming today to do another 100 derringers but currently I lack the will. Every pin requires 15 steps 4 of which must be within .2mm times 150 pins. That's alot of steps it takes me about 30 minutes start to finish to make a pin once I have the measurements..
The delay for #81+ could be as much as 2 weeks but should be the weekend after the first 80 ship. Just want to be clear so there are no disgruntled customer. My goal is to keep you properly gruntled.
Turk: could you continue the list but starting at #81 there will be a delay until the next run of pins are complete. I need to do something other than pins for a while, also the reason send ins have been done the second they arrived. As it stands I will have 150 pins to prepare. 120 pins are complete, the remaining 30 will be done long before the first derringer arrives. I have the materials coming today to do another 100 derringers but currently I lack the will. Every pin requires 15 steps 4 of which must be within .2mm times 150 pins. That's alot of steps it takes me about 30 minutes start to finish to make a pin once I have the measurements..
The delay for #81+ could be as much as 2 weeks but should be the weekend after the first 80 ship. Just want to be clear so there are no disgruntled customer. My goal is to keep you properly gruntled.
Wow that's a real bummer to hear....Every one of my vapage bottles have been tossed aside. They didn't start out leaking, but after running 45-50 ml thru mine, each has started leaking and randomly losing pressure no matter how perfectly the home was drilled.
TüBeGüY;15242765 said:Wow that's a real bummer to hear....
I JUST ordered 20 of them ( I think I have 7 REO's now)
I was really hoping they were the bees knees.
Oh well.