OK... jumping right into updates are we?
Z-atty.... All remaining lists... I have about 100 top caps that have cosmetic flaws ranging from minor to major... they are at the
shop being re-worked
All remaininr Minis and Standards... same problem as above.
BAM is still at the finish
shop being anodized... again... I rejected the last finishers work and had them stripped.
ASH... I don't have top caps, I can't produce them yet.
Pchela... Should ship mid August with the Cobalt... all metalwork is done.
Stainless
tanks... in production.