One of you have to be telling the truth.. Or neither of you.. Or maybe just one of you..
Tough call to make
One of you have to be telling the truth.. Or neither of you.. Or maybe just one of you..
The trick is to drink it straight outta the teat. That's money right there!
How dare you try and overbid me!!
Well - can't live in 2 houses at once![]()
Lots left to do - the rear steps have been repaired (lox did a nice concrete repair on them) - the plaster walls in the breakfast room were fixed where they met the ceiling and painted - woodwork in breakfast room and kitchen done - and main bathroom has been recaulked and sealed and painted.
Next stop - the dining room which is the one room (plus the hallways) that hasn't had it's wallpaper removed.- including the ceilings peeps - but the wallpaper in the dining room is on nice and tight and the test showed the paint didn't lift it. It's oatmeal paper - nice texture but in finely sanding seams the texture disappears which means ......a light sanding for the whole room prior to paint. Lots of ladder time - crown molding.
One bedroom was redone when my mom came down - not alot to do in there except I still have to go through her things - haven't been able to bring myself to do that yet
The middle bedroom needs paint - but it's plaster is in good shape
Master bath was done already but we need to figure out a flooring problem
Master bedroom is another big project - plaster repair on the ceiling - so that will definitely take some time.
New entry side door for garage - double wide door was already replaced - waiting to be installed.
It just seems to go so slowly.....and he garage has too much "stuff" in it......
Ok - it looks daunting reading how much still needs to be done.....![]()
Tough call to make
I bet that's the whole shebang!
I bid 1 dollar, Bob!
I think I'm at a stand still with this one..
That's a triple shebang!
Well - can't live in 2 houses at once![]()
Lots left to do - the rear steps have been repaired (lox did a nice concrete repair on them) - the plaster walls in the breakfast room were fixed where they met the ceiling and painted - woodwork in breakfast room and kitchen done - and main bathroom has been recaulked and sealed and painted.
Next stop - the dining room which is the one room (plus the hallways) that hasn't had it's wallpaper removed.- including the ceilings peeps - but the wallpaper in the dining room is on nice and tight and the test showed the paint didn't lift it. It's oatmeal paper - nice texture but in finely sanding seams the texture disappears which means ......a light sanding for the whole room prior to paint. Lots of ladder time - crown molding.
One bedroom was redone when my mom came down - not alot to do in there except I still have to go through her things - haven't been able to bring myself to do that yet
The middle bedroom needs paint - but it's plaster is in good shape
Master bath was done already but we need to figure out a flooring problem
Master bedroom is another big project - plaster repair on the ceiling - so that will definitely take some time.
New entry side door for garage - double wide door was already replaced - waiting to be installed.
It just seems to go so slowly.....and he garage has too much "stuff" in it......
Ok - it looks daunting reading how much still needs to be done.....![]()
I always hated those jerks that pulled that crap on the show..
Ha, my new avi looks like a cow hanging from a rope....
We'll have a few adult beverages and talk it out....
Yeah, what the heck is that anyway?
I always wanted to go on there and be the first bidder, and bid $1!
I would bid $1 every time, just to piss everyone off.....or just bid a penny over everyone!
Can do, captain!
Ummm......I think it's batman poking catwoman in the .... with his finger as she's trying to climb in a Window???
And what was even worse, was the fools that would bid a dollar more.. I wish Bob would have walked up to them and gave them a Gilmore beat down!