Work's keeping me busy this week, though thankfully I shouldn't have another round of weekend work.
Next time someone notices a nicotine sale, give me a shout. I figure something should be going on for either memorial day or July 4, though I've got enough through at least year end.
Looking forward to doing gutters at camp, stop dripping from messing up the deck staining. 32' of it will be trivial, since the trim is just over 8' above deck height. The last 8' is where stairs go down to the pad, a bit tougher access. I'm thinking maybe do the deck part as one section, downspout dropping between the stair railing and porch, then have the part parallel to the stairs come in to the other end of the downspout section of gutter. That'll keep the pita section of gutter short, with the main part fully assembled and riveted on the deck.
I also have to finish putting the new wheels on the boat. I got the first one in Saturday, worked out the actual how-to-do, other 3 will go fairly fast though I have to slide the plates with reg number a couple inches aft since the new posts are 4x6 instead of 4x4.
We did pick up the old evinrude 4.5hp outboard, it ran beautifully on a barrel check. The guy came down another $100, I'm quite happy with the price. This'll give enough oomph to explore the southern end of the lake, where diving should be better [emoji3]