Yup, it sure sounds like more work coming your wayWell my order arrived...Element sent me a three flavor combo custard instead of the strawberry custard I ordered.....otherwise all is fine....I jumped back into the pool with an Odin Mini topped with a Hellbeast sporting Vaporesso ceramic .5 coils....Jam Monster Vanilla Custard at 6ml/mg....The Odin is great...The screen is kinda small but I only vape watts so manageable with glasses....Hellbeast....well other than the band around the top making a complete fill a little tricky all is good there....the Vaporesso coils are fine by me...Jam Monster is pretty good...Pretty pleased overall...Best thing is I had 3 cigars left when I filled that first tank...Still got the 3 though I do plan on smoking them just because I can....Already my sinuses are clearing and a lot less hacking in the am.....Trust no matter how hard core you are those stinkies are always lurking...I live in NC so tobacco prices are probably the best in the Nation...40 bucks gets 40 cigars with 2 dimes change...That lasted @ 2.5 days and Hellyeah when they running low you're gonna trip it on down to the store....At that rate even the most expensive PV will be paid for in no time at all....I got the top air flow tank 908 recommended as well but only found it in stainless...Eciggity has it in black but they're in Hawaii...I'm gonna give it a go and suspect it to be a winner....A couple or three PVs will be required for different flavors and making damn sure you got backup...The single 21700 is an all day battery...I still had 50% on yesterdays battery this am....So far all is good....
That old lake house....I figured everything up on the 4 sliding glass door install....including fixing the hole water had blown through the floor it took up 4.5 days total....As stated the Cuzzo's Ex pays up front or no work period....I picked up those doors the Sunday before Christmas and we finished installing new trim around the interior last week....We got paid initially....another check for the hole in the floor....another check when new trim was required to cover larger gaps due to the doors not being sized like the old ones...8 full months and 4.5 days working....All work was done on the double after the checks cleared and cash was in hand....Still 8 months....SHEESH!!!!! The realtor has been getting antsy....Says she had someone willing to go $485,000...There is an extra wooded lot beside the house included in that.....Well that got us another check to move the remaining stuff in the house to Raleigh...We have to skin the sheetrock ceiling in the laundry room and a small piece in the garage....the garage ceiling like the laundry is toast...Like a bandaid on a bullet wound putting in only a 1/2 piece of sheetrock and I highly suspect that will be an issue come inspection time...We'll see.....For now a check should be deposited tomorrow....I gotta check here in a few....Cuzzo and his Son are heading to Minnesota for a week leaving out Tuesday...Visiting Cuzzo's daughter....The check should be near clear when they return....So more work....It won't take long this time and I'll be dang glad when I'm not waiting on Cuzzo's Ex anymore....They let the roof go and ruined those ceilings...I suspect when the inspection is done more work will come our way....Did I mention the termite tunnels on the garage wall????
