Precise ELA Telescoping Mod by Super-T!

Status
Not open for further replies.

forcedfuel50

Unregistered Supplier
ECF Veteran
The Shockwaves ship dates are unaffected by anything ELA related. The Shockwaves parts are all machined and we are (once again) waiting on the Rhodium Platers to plate a new batch of spring plungers they messed up. On the ELA, we are pretty much all tooled up and should be running major ELA parts by weeks end. I'll have a better outlook by weeks end and let you know where we sit.
 

Nicblazer

Super Member
ECF Veteran
Verified Member
Aug 28, 2011
839
1,216
Indiana
The Shockwaves ship dates are unaffected by anything ELA related. The Shockwaves parts are all machined and we are (once again) waiting on the Rhodium Platers to plate a new batch of spring plungers they messed up. On the ELA, we are pretty much all tooled up and should be running major ELA parts by weeks end. I'll have a better outlook by weeks end and let you know where we sit.

Giggidy !!
 

forcedfuel50

Unregistered Supplier
ECF Veteran
any updates? Is it possible to miss something youve never even had yet?


No new updates, same status as monday:

On the ELA, we are pretty much all tooled up and should be running major ELA parts by weeks end. I'll have a better outlook by weeks end and let you know where we sit.
 

forcedfuel50

Unregistered Supplier
ECF Veteran
Update 02/08/13. I had estimated we would be running ELA parts by this weeks but i'm not a 100% positive we will be running parts today as we are still have some tooling straggling in. This afternoon we'll just continue on getting the machine set up with what tooling we do have and proving out the programs so we may be running some parts this afternoon, or monday at the latest.
 

Nach

Ultra Member
ECF Veteran
Verified Member
Jul 14, 2012
2,407
4,676
48
Chicagoland, USA
jazco.net
Update 02/08/13. I had estimated we would be running ELA parts by this weeks but i'm not a 100% positive we will be running parts today as we are still have some tooling straggling in. This afternoon we'll just continue on getting the machine set up with what tooling we do have and proving out the programs so we may be running some parts this afternoon, or monday at the latest.

So, I'm assuming that the only parts that you don't have complete control over are the ones you need to have plated. Do you anticipate the plated parts holding up the ELA project?
 

forcedfuel50

Unregistered Supplier
ECF Veteran
So, I'm assuming that the only parts that you don't have complete control over are the ones you need to have plated. Do you anticipate the plated parts holding up the ELA project?

They've never messed up a batch of the smaller center posts and usually bang those out in a week, though they've been having a heck of a time with the bigger spring plungers (but those aren't on the ELA). We'll do our best to push them through as fast as possible.
 

Cjax

Ultra Member
ECF Veteran
Verified Member
Sep 12, 2012
1,750
1,211
RVa USA
All I have to say is this new ELA is the greatest thing I've seen since I've started vaping! Not trying to brown-nose or nothing, but I haven't got this excited about a mod since, umm, ever! This thing better not go anywhere cause I don't quite have the cash for one yet, but that doesn't stop me from going to the website on a daily basis and loading up my basket with one plus the kick tube and extra rings. I'll let you guys get your new production assemly rolling and hopefully by the time all the kinks are worked out I'll be able to throw down for one. I been stalking this thread for a few weeks now checking for the updates and it's looking like it's coming together soon so I figured I'd jump on the bandwagon and chime in.
 
Status
Not open for further replies.

Users who are viewing this thread