True.............
Tricky Kon, how did you do that? Changed the color back & forth, it looks like from the codes above my message.
True.............
Pictures of broken concrete, holes in the floor and finished concrete will follow in the near future. It's not really part of the solar project, just some prep work before the actual solar project starts. We'll probably be without hot water for a day when I actually move the water heater. There is a lot of pipe work to do so the hot water heater can be supplied directly from the well, with the oil furnace as a pre-heater or the solar system for a pre-heater. I'm also going to color code all the piping in the basement for cold, hot water heat, hot water heat return, domestic hot water and solar hot water. It's starting to turn into a maze down there!
DUDE! I told you put a small panel for your garden lights and you created a factory.....
I drink the same coffee everyday.

Good morning Voltville and thanks for the coffee. I need at least one cup, heavy on the sugar and cream, everyday with my morning vape... RY4!!!
Heavy hard rain this morning... and there is nothing worst than an extremely wet dog that has very thick long hair coming in the house after their morning "business" trip. Shaking all over me, dripping all over the floor. Even with a towel ready Ive got to dry him, the floor and myself before my coffee and 1st vape of the day...![]()
Don't you love the smell of wet dog?
DUDE! I told you put a small panel for your garden lights and you created a factory.....
I drink the same coffee everyday.
DUDE! I told you put a small panel for your garden lights and you created a factory.....
I drink the same coffee everyday.
I don't think he likes it either. Poor thing won't get off the towel now... had to use three to get him "barely damp". I had to love my little stinky baby up because after my cussin & fussin session, he thought I was yelling at him because he did something wrong...
I just made a grooming appointment for him but the earliest I could get is Friday.