Here's where we are presently:
Everything is coming to a closing point, things that we're still waiting on to get finished >.<
- Main Room:
- Electrician needs to remove all the lights and put up new ones.
- Bar/Secondary Checkout/Wall are being built.
- Still waiting on Furniture, but this isn't necessarily essential.
- Bathroom:
- Floor tile needs put down, wall paper needs to be added and sink needs to replace.
This is our most expensive overhaul of a storefront, but will definitely be worth it. Sadly a lot of hiccups in the road that we weren't anticipating from the floor being uneven due to massive cracks, delays on items that were needed for the store (Lights, Furniture, etc) that had ridiculous lead times.
We will have a soft opening, there will be some things missing but we really want to get this opened as quickly as possible. So the last things that need finished will be the construction (which is under way) and the bathroom before we can open the doors.
We will start interviewing people this week as well