Sorry Uncle. I was awake it the middle of the night. Slept late.
Sorry Uncle. I was awake it the middle of the night. Slept late.
Hoping so.I made it to work but am getting a touch of short timers attitude with the holidays and vacation time coming up. I've got plenty to do but don't feel much like doing it. I'll power through like I usually do when I get in a mood like this.
It's funny how I kept thinking that the strawberry rhubarb recipe I'm working on needed a base then this morning on the way to work I was really enjoying it without a base flavor. Hopefully the new mix with biscuit that I mixed last night will be even better.
Sorry Uncle. I was awake it the middle of the night. Slept late.
That’s very nice of you, UncleWell, I truly hope you are welll rested then, especially since you are going to have a very busy day . . . Just Sayin' . . .
BTW: Didn't sleep well myself and when I wakeup this early, I always expect to "see" your shinning post first thing to get my day started on a positive note . . .
.
Mornin' all you mixers! I was up earlier and had two cups of decaf coffee while checked the news to see if the world had blown up yet. Good news! It hadn't. I fell back asleep and now I'm on my first cup of real coffee.
Good morning random folks
Have you any plans today?
I wuz talkingThat’s not me.
STOP ...........I'M TIREDTemps near 70 until Friday, then rain Sunday. Seriously thinking about going in town for 200 feet of 12/2, triple switch box, maybe three or four work boxes, 200 feet of EMT, a couple of motion activated lights, maybe four GFI duplex, a solid mount work station light, and a four foot shop light. And about about 20 EMT box connectors, a 5/8 extended blade drill bit, a bag of wire nuts and a roll of electrician's tape.
And I should be calling 411 today...
Is that enough for one day, Fran ?
(probably more like a week)
I wuz talking
STOP ...........I'M TIRED
More than enough I’m sure. I’m assuming this is for your new shed?Temps near 70 until Friday, then rain Sunday. Seriously thinking about going in town for 200 feet of 12/2, triple switch box, maybe three or four work boxes, 200 feet of EMT, a couple of motion activated lights, maybe four GFI duplex, a solid mount work station light, and a four foot shop light. And about about 20 EMT box connectors, a 5/8 extended blade drill bit, a bag of wire nuts and a roll of electrician's tape.
And I should be calling 411 today...
Is that enough for one day, Fran ?
(probably more like a week)
I have to see what I can do with hitt’s recipe. I don’t have any Purlium flavors anymore except raspberry. I love the raspberry.
Temps near 70 until Friday, then rain Sunday. Seriously thinking about going in town for 200 feet of 12/2, triple switch box, maybe three or four work boxes, 200 feet of EMT, a couple of motion activated lights, maybe four GFI duplex, a solid mount work station light, and a four foot shop light. And about about 20 EMT box connectors, a 5/8 extended blade drill bit, a bag of wire nuts and a roll of electrician's tape.
And I should be calling 411 today...
Is that enough for one day, Fran ?
(probably more like a week)