The ShockWave by Super-T Preorder Thread

Status
Not open for further replies.

forcedfuel50

Unregistered Supplier
ECF Veteran
Update: I met with my machine shop this morning. We went over the prototypes and are making a few changes not to the design, but to the machining processes. One notable change being the drilling out of excess material between the switch cavity and the very top of the cap to save weight.

We originally were milling it out, but it has proven very ineffective due to the slow machine times it takes to hollow all that out material, so we are machining the switch half and drilling out beyond that. It's hard to explain, but you'll get it when you see it (which its on the inside top of the cap, so even then you never really see it, its purely to save weight).

I am going to go ahead and Rhodium/Gold plate all pieces of the Spring loaded battery plunger mechanism, as well as the top and bottom contacts bringing to total number of Gold/Rhodium plated parts in the ShockWave to 5!

We also went over the new body and he will be doing up the final prototypes of both the slotted and non slotted versions over the next two weeks. And then we will roll into full production. (I will keep you posted)

To be completely straight forward, this is going to take a few more weeks then originally estimated. I hope you will be patient with us as, though the ShockWave may not have a ton of "features", it is undoubtedly one of the most intricate, precise, complex and involved mods made to date. The attention to detail is outstanding and i know you will not be disappointed.

Those not willing to wait, there is absolutely no pressure, and no hard feelings if you'd like to withdraw your order, but if you step out of line, keep in mind you will lose your spot should you change your mind later.
 

snork

Vaping Master
ECF Veteran
Verified Member
May 30, 2011
6,181
11,235
CO
To be completely straight forward, this is going to take a few more weeks then originally estimated. I hope you will be patient with us as, though the ShockWave may not have a ton of "features", it is undoubtedly one of the most intricate, precise, complex and involved mods made to date. The attention to detail is outstanding and i know you will not be disappointed.

In other words, not taking into account whatever next fantastic thing you design, one could call this your Magnum Opus...

Those not willing to wait, there is absolutely no pressure, and no hard feelings if you'd like to withdraw your order, but if you step out of line, keep in mind you will lose your spot should you change your mind later.

Everything you wrote simply made me want two of them instead.
 

silverrocks

Super Member
ECF Veteran
Verified Member
Feb 1, 2011
687
369
USA
www.ihatesilver.com
In other words, not taking into account whatever next fantastic thing you design, one could call this your Magnum Opus...



Everything you wrote simply made me want two of them instead.

I have my cart ready to order, but am "modless", so how much longer do you think it may take? 6 weeks?
 

Sense Field

Reviewer / Blogger
ECF Veteran
Verified Member
Mar 8, 2010
777
431
Nomad
Update: I met with my machine shop this morning. We went over the prototypes and are making a few changes not to the design, but to the machining processes. One notable change being the drilling out of excess material between the switch cavity and the very top of the cap to save weight.

We originally were milling it out, but it has proven very ineffective due to the slow machine times it takes to hollow all that out material, so we are machining the switch half and drilling out beyond that. It's hard to explain, but you'll get it when you see it (which its on the inside top of the cap, so even then you never really see it, its purely to save weight).

I am going to go ahead and Rhodium/Gold plate all pieces of the Spring loaded battery plunger mechanism, as well as the top and bottom contacts bringing to total number of Gold/Rhodium plated parts in the ShockWave to 5!

We also went over the new body and he will be doing up the final prototypes of both the slotted and non slotted versions over the next two weeks. And then we will roll into full production. (I will keep you posted)

To be completely straight forward, this is going to take a few more weeks then originally estimated. I hope you will be patient with us as, though the ShockWave may not have a ton of "features", it is undoubtedly one of the most intricate, precise, complex and involved mods made to date. The attention to detail is outstanding and i know you will not be disappointed.

Those not willing to wait, there is absolutely no pressure, and no hard feelings if you'd like to withdraw your order, but if you step out of line, keep in mind you will lose your spot should you change your mind later.

Do you have any photos of the slotted and non-slotted prototypes next to each other? Also, would like to see what the slotted looks like with a blue battery in it since the color of the battery is part of the design in the slotted version. I imagine you originally thought there would be a red battery in there, but at the moment, 26650 only comes in blue or orange.

Also, when a 26500 is inserted with the kick sleeve, will the sleeve be visible through the slots?
 

silverrocks

Super Member
ECF Veteran
Verified Member
Feb 1, 2011
687
369
USA
www.ihatesilver.com
Only the slotted prototype was done, the non slotted will be done up over the next two weeks i was informed. I will post pics up as soon as i have them!

Hello david,
I won't need a sleeve. Should I just mention this during checkout. I won't use a kick; I think the Shockwave will be just enough (unslotted and shiny) :)
 

siouxsie

Ultra Member
ECF Veteran
Verified Member
Aug 9, 2010
2,021
488
55
Minnesota
Hello david,
I won't need a sleeve. Should I just mention this during checkout. I won't use a kick; I think the Shockwave will be just enough (unslotted and shiny) :)

It comes with it, and you might well eventually want a Kick, so, it's a no brainer! :) Believe us, you'll be glad you gave yourself the option.
 

Technonut

Vaping Master
ECF Veteran
Verified Member
Oct 11, 2010
5,090
7,290
62
East Coast, USA
Nothing to do but pull up a chair... The SW is worth the wait.. :)


waiting%2Broom%2Bsign.jpg
 
Status
Not open for further replies.

Users who are viewing this thread