The final unit of GP PAPS X is ready, but we are not 100% satisfied with the level of precision we asked for in the schematics. So we divided the production of its parts to 2 different CNC shops to achieve what we want exactly. The parts will be calibrated in order to keep the tolerance around 0,005 mm for the parts of the switch, the tube, caps, everything! In a few days, the Easter holidays start and for over a week, all CNC shops will close. These manufacturing and timing delays postpone the release date of GP PAPS X, so I won't post ETA for that. It will be ready when it will.
ETA is something very difficult to identify when we speak for production of prototype mods, at least for us who may decide at the last moment, that something is not good enough and it has to be changed. We are completely crazy with what we are doing, so the only thing we can promise is a continuous improvement in what we do.
ETA is something very difficult to identify when we speak for production of prototype mods, at least for us who may decide at the last moment, that something is not good enough and it has to be changed. We are completely crazy with what we are doing, so the only thing we can promise is a continuous improvement in what we do.