For any that are interested here is a kitchen update. Granite purchased. Had to wait for sink and faucet to be delivered and signed for, of course they were shipped separately and took up two days of waiting for a delivery. You would think I would be used to waiting for deliveries with all the vaping stuff I buy.
1100 feet of Amish oak hardwood flooring was delivered by the contractor starting Monday. Took 2 days and two trips. Of course, DH had to help bring it in since the contractor did not have a helper. Also, of course, DH fell down the front concrete steps after done carrying a bunch of it. So, 1/2 day in urgent care for xrays on hip, left wrist and head and lots of various sized bandages. He is real sore, but fine outside of a mild concussion. He thinks he is superman. He is not. I direct traffic for these types of things. And conduct quality control.
Today is lawn and shrub maintenance day. DH is out there making sure the 2 guys do not cut down my roses and camellias and anything else that I will go nuts over if mowed down or too enthusiastically manicured with hedge trimmers. DH cut down my beautiful Harry's Walking Stick tree to about 2 feet high. He almost needed the ER on that day too. His reason was that the big leaves were getting into the pool that we do not even go in anymore.
I have been waivering between having a cigarette and beating a few select people with my Provari with an 18650 battery in it. I spent too much money on the Provari and the R91 to risk damage to it, or cause a malfunction by blood getting into the computer board. I know the repair would be cheap and quick, but I do not want to be parted from it that long.