Intro To The "3DFS ALPHA" By: Digitalciggz.com

Status
Not open for further replies.

ukeman

PV Masher
Supporting Member
ECF Veteran
Verified Member
Aug 22, 2010
7,718
5,129
Kauai, Hawaii
I'm with him...
I will be standing by, and will stand by through all four seasons if needed :)

Good things take time. Keep up the good work.

unless i'm ahead on the list... heheh.

Shadow, magic is the energy that produces what discerning masses demand... it would be presumptuous in the extreme to insist on instant gratification.

I also know the energy of demand is the other half of inspiration to create... it's part of the equation... and you deserve to get your design out without unthinking partners in production slowing the process down...

a blessing on all factors involved and a pox on any and all evil doers that would stand in the way (lol... jk; this is all in good clean fun)
 

Shad0w

Super Member
ECF Veteran
Jun 12, 2010
595
63
Trapped by Schrödinger's cat....
Thanks much for your understanding everyone.
Though the Shadow Feed protos did come in today so I will test them and likely issue any changes and final approval for production next week come Monday.
I am very happy with how they turned out. Medium draw should suit most everyone quite well.
Not too stiff and not too airy = Juuuust right. ;)

So there is your little update. Sorry there is not more to amaze and excite, but hey, it's what I got. :)

- Shad0w
 
Last edited:

benjayman2

Ultra Member
ECF Veteran
Nov 29, 2010
1,873
158
38
Chicago, IL
We all know your working you ... off and doing what needs to be done. Take your time, we'll be here. Just don't pull a Steve Jobs on us k?
I'm already sad about that (big apple fan) so work hard, but don't kill yourself over it. We'll be here :)

I am doing my damnedest to make sure it comes in Feb (likely as surmised end of..) but I hope you will not be too upset if it does come down to first half of March.

I can not control everything, and some places are having small delays and each one adds up to more time wasted.
Believe me when I tell you, you do not understand how frustrating it is for me to deal with these delays.
All I can do is my best to make them as short a wait as possible and get them out to your hands as quickly as I am able.
It is tough to have to count on others for certain things when your work is already done and you are only waiting.

On the bright side, I think you will all be very happy with it.

I hope no one is too upset with me, but some things are just out of my control.. :(

- Shad0w
 

Drumonron

Ultra Member
ECF Veteran
Verified Member
Sep 25, 2009
2,312
1,487
59
The Goldilocks standard....yes....definitely...I like it.

Keep the faith Shadow....as for us....as everyone else put it....well...we already have a mountain
of faith in you.

We'll be here.

Heck...you're a pioneer...clearing the brush and paving a new path....did you think it would be easy...heck no...get back in there put yer chin up, chest out, suck the belly in and give it all you got.

You're a rock!

Eat lightning and ....crap thunder....you're a greasy fast Italian Stalion, as Burgess said as Micky in ROCKY!!




Whether Rocky is applicably comparative to the Eclipse production is doubtful but I just wanted to hear a little Burgess...hehe
 
Last edited:

cos

Ultra Member
ECF Veteran
Verified Member
Oct 22, 2009
2,215
497
St Petersburg Florida
Hey to all my Eclipse buds. Shadow we know you and Mag are working real hard and its stressfull but take your time. We are here waiting and we will continue to wait so no problem here. Drum said Feb is short quick month so whenever is good enough for me.
and the update "Just Right on the draw" is perfect. Well done. Peace brothers
 

dspin

Vaping Master
ECF Veteran
Verified Member
Sep 2, 2010
7,513
8,328
USA
Nobody here should be upset w/you for delays. Only thing that would upset me personally is if I was left out of the first run. Then I would throw fits, tantrums, etc. Just like a little kid. Ha Ha



I am doing my damnedest to make sure it comes in Feb (likely as surmised end of..) but I hope you will not be too upset if it does come down to first half of March.

I can not control everything, and some places are having small delays and each one adds up to more time wasted.
Believe me when I tell you, you do not understand how frustrating it is for me to deal with these delays.
All I can do is my best to make them as short a wait as possible and get them out to your hands as quickly as I am able.
It is tough to have to count on others for certain things when your work is already done and you are only waiting.

On the bright side, I think you will all be very happy with it.

I hope no one is too upset with me, but some things are just out of my control.. :(

- Shad0w
 

jimho

Ultra Member
ECF Veteran
Dec 23, 2009
1,699
381
New York
Look at what happens when I go and play in the snow for a few days.....
Drumon breaks 1000 and Mario changes his picture.....

FWIW, Target dates are just that. They are nothing more than best estimates based on everyone being able to get their end of the deal done within a given time frame. PCBs and electronic components are always a problem because suppliers can only tell you how long it will be based on today's inventory and backlog- and tomorrow you might get a different answer. You need the components before the PCB is fab'd, and then and the PCB's, buttons and cases and connectors before you can assemble etc.....

Thanks for being a realist about it and for sharing the info.
 
Status
Not open for further replies.

Users who are viewing this thread